REN BY SUSHI LIBRARY - DUBAI
Oct 2024
Basement VentilationProject Overview
SNOVAC successfully delivered a comprehensive HVAC solution for Zenith Technologies' corporate workspace, designed to ensure optimal indoor comfort, energy efficiency, and reliable system performance. The project involved detailed load calculations, system design, and installation of a centralized air-conditioning system tailored to the building's operational requirements. Our team executed the project with minimal disruption to daily operations, ensuring timely completion and seamless commissioning. The solution now provides a comfortable, well-regulated indoor environment while supporting energy-efficient operation and long-term reliability.
Client Requirement
Zenith Technologies required an HVAC system that could:
- •Maintain consistent indoor comfort across all work zones
- •Support energy-efficient operation and long-term cost optimization
- •Integrate seamlessly with the building's architectural and operational layout
- •Be executed within a defined timeline without impacting office operations
SNOVAC's Scope of Work
SNOVAC provided end-to-end HVAC solutions, covering the complete project lifecycle:
- •Detailed site assessment and heat load calculations
- •HVAC system design and engineering
- •Selection of appropriate air-conditioning and ventilation systems
- •Supply and installation of a centralized air-conditioning system
- •Integration with existing electrical and building management systems
- •Testing, commissioning, and performance validation
- •Support energy-efficient operation and long-term cost optimization
- •Integrate seamlessly with the building's architectural and operational layout
- •Be executed within a defined timeline without impacting office operations
Engineering & System Design
Our engineering team conducted thorough load calculations and airflow analysis to design a system tailored to the workspace's occupancy patterns and functional zones. The centralized HVAC system was designed to ensure:
- •Uniform temperature distribution
- •Improved indoor air quality
- •Optimized energy consumption
- •Quiet and unobtrusive operation suitable for office environment
Execution & Installation
The installation phase was carefully planned and executed to ensure minimal disruption to ongoing office operations. SNOVAC followed strict safety and quality protocols, coordinating closely with the client's facility management team to meet project timelines.
All installations were completed efficiently, with attention to workmanship, system alignment, and operational readiness.
Testing & Commissioning
Post-installation, the system underwent comprehensive testing and commissioning to verify performance against design parameters. This included airflow balancing, temperature validation, and operational checks to ensure optimal efficiency and reliability from day one.
Project Outcome
The completed HVAC system now delivers:
- •A comfortable and well-regulated indoor environment
- •Enhanced energy efficiency and reduced operational costs
- •Reliable and consistent system performance
- •Improved workplace comfort and productivity
Value Delivered
- •Engineering-led, customized HVAC solution
- •Timely project delivery with minimal operational disruption
- •Energy-efficient system design
- •Reliable after-sales and maintenance support
Conclusion
This project reflects SNOVAC's ability to deliver high-quality HVAC solutions for corporate environments through precise engineering, efficient execution, and client-focused service. The successful completion of the Zenith Technologies workspace reinforces our commitment to building systems that perform reliably and sustainably.